Reinforced soil method - Greenery tail arm method (Terra Trail F2 method)
Harmony with nature, tranquility. Now, Hirose reflects anew.
The greening tail arm method, as its name suggests, is designed to allow for the greening of the surface of tail arm embankments. The basic principle of the method is the same as that of the tail arm method, but instead of using heavy concrete skins, it employs mesh panels and vegetation mats, making it even easier to construct. The greened embankment surface harmonizes with the surrounding environment in suburban and mountainous areas.
- Company:ヒロセ補強土
- Price:Other